Task Generation Rules

Core Principles

1. Natural Language Descriptions

Focus on capabilities and outcomes, not code structure.

Describe:

  • What functionality to achieve
  • Business logic and behavior
  • Features and capabilities
  • Domain language and concepts
  • Data relationships and workflows

Avoid:

  • File paths and directory structure
  • Function/method names and signatures
  • Type definitions and interfaces
  • Class names and API contracts
  • Specific data structures

Rationale: Implementation details (files, methods, types) are defined in design.md. Tasks describe the functional work to be done.

2. Task Integration & Progression

Every task must:

  • Build on previous outputs (no orphaned code)
  • Connect to the overall system (no hanging features)
  • Progress incrementally (no big jumps in complexity)
  • Validate core functionality early in sequence
  • Respect architecture boundaries defined in design.md (Architecture Pattern & Boundary Map)
  • Honor interface contracts documented in design.md
  • Use major task summaries sparingly—omit detail bullets if the work is fully captured by child tasks.

End with integration tasks to wire everything together.

3. Flexible Task Sizing

Guidelines:

  • Major tasks: As many sub-tasks as logically needed (group by cohesion)
  • Sub-tasks: 1-3 hours each, 3-10 details per sub-task
  • Balance between too granular and too broad

Don't force arbitrary numbers - let logical grouping determine structure.

4. Requirements Mapping

End each task detail section with:

  • _Requirements: X.X, Y.Y_ listing only numeric requirement IDs (comma-separated). Never append descriptive text, parentheses, translations, or free-form labels.
  • For cross-cutting requirements, list every relevant requirement ID. All requirements MUST have numeric IDs in requirements.md. If an ID is missing, stop and correct requirements.md before generating tasks.
  • Reference components/interfaces from design.md when helpful (e.g., _Contracts: AuthService API)

5. Code-Only Focus

Include ONLY:

  • Coding tasks (implementation)
  • Testing tasks (unit, integration, E2E)
  • Technical setup tasks (infrastructure, configuration)

Exclude:

  • Deployment tasks
  • Documentation tasks
  • User testing
  • Marketing/business activities

Optional Test Coverage Tasks

  • When the design already guarantees functional coverage and rapid MVP delivery is prioritized, mark purely test-oriented follow-up work (e.g., baseline rendering/unit tests) as optional using the - [ ]* checkbox form.
  • Only apply the optional marker when the sub-task directly references acceptance criteria from requirements.md in its detail bullets.
  • Never mark implementation work or integration-critical verification as optional—reserve * for auxiliary/deferrable test coverage that can be revisited post-MVP.

Task Hierarchy Rules

Maximum 2 Levels

  • Level 1: Major tasks (1, 2, 3, 4...)
  • Level 2: Sub-tasks (1.1, 1.2, 2.1, 2.2...)
  • No deeper nesting (no 1.1.1)
  • If a major task would contain only a single actionable item, collapse the structure and promote the sub-task to the major level (e.g., replace 1.1 with 1.).
  • When a major task exists purely as a container, keep the checkbox description concise and avoid duplicating detailed bullets—reserve specifics for its sub-tasks.

Sequential Numbering

  • Major tasks MUST increment: 1, 2, 3, 4, 5...
  • Sub-tasks reset per major task: 1.1, 1.2, then 2.1, 2.2...
  • Never repeat major task numbers

Parallel Analysis (default)

  • Assume parallel analysis is enabled unless explicitly disabled (e.g. --sequential flag).
  • Identify tasks that can run concurrently when all conditions hold:
    • No data dependency on other pending tasks
    • No shared file or resource contention
    • No prerequisite review/approval from another task
  • Validate that identified parallel tasks operate within separate boundaries defined in the Architecture Pattern & Boundary Map.
  • Confirm API/event contracts from design.md do not overlap in ways that cause conflicts.
  • Append (P) immediately after the task number for each parallel-capable task:
    • Example: - [ ] 2.1 (P) Build background worker
    • Apply to both major tasks and sub-tasks when appropriate.
  • If sequential mode is requested, omit (P) markers entirely.
  • Group parallel tasks logically (same parent when possible) and highlight any ordering caveats in detail bullets.
  • Explicitly call out dependencies that prevent (P) even when tasks look similar.

Checkbox Format

- [ ] 1. Major task description
- [ ] 1.1 Sub-task description
  - Detail item 1
  - Detail item 2
  - _Requirements: X.X_

- [ ] 1.2 Sub-task description
  - Detail items...
  - _Requirements: Y.Y_

- [ ] 1.3 Sub-task description
  - Detail items...
  - _Requirements: Z.Z, W.W_

- [ ] 2. Next major task (NOT 1 again!)
- [ ] 2.1 Sub-task...

Requirements Coverage

Mandatory Check:

  • ALL requirements from requirements.md MUST be covered
  • Cross-reference every requirement ID with task mappings
  • If gaps found: Return to requirements or design phase
  • No requirement should be left without corresponding tasks

Use N.M-style numeric requirement IDs where N is the top-level requirement number from requirements.md (for example, Requirement 1 → 1.1, 1.2; Requirement 2 → 2.1, 2.2), and M is a local index within that requirement group.

Document any intentionally deferred requirements with rationale.